Fusion Project Phase 2!
The final product, phase 2, getting wrapped up today! Well done Triangle Design Group team!hashtag#fusion
The final product, phase 2, getting wrapped up today! Well done Triangle Design Group team!hashtag#fusion
Here at Triangle Design Group, we understand the unique needs of Semiconductor Research and Development fabs. Whereas production facilities require
A recent design/build of a hazardous area rated SMBC (simulated moving bed chromatography) system. At TDG we have the capability
Recently designed and built these chemical bath pH control systems. We keep building and growing here at TDG. From 1/16”
Starting out the year with our first shipment of industrial control panels for UHP gas delivery systems!
We converted a 300 square foot section of our facility into an ISO class 6 (class 1000) Cleanroom. With further
Starting to look like a real place. This has been an extremely rewarding couple of weeks. First orbital welds next
Our new facility at 6 Pomerleau Street in Biddeford, Maine will be headquarters of Triangle Design Group LLC as well
A couple of years ago my wife Jenny and I bought a small parcel of land in Coral Bay, St
Purist Energy Purist Energy was a small business that operated for about 5 years in the renewable energy space and